New Road for Nizhniy Novgorod Pedestrians

On the Shkolnaya Street in the Avtozavodsky district of Nizhny Novgorod was repaired a pedestrian road with an area of ​​almost 900 sq.m.

The work was completed after citizens contacted the local administration. This was reported by the press service of the city hall.

The sidewalk leads to two schools, a clinic and kindergartens. At the same time, asphalt has not been repaired since the construction of residential buildings.

“I have been living here for over 27 years. The road was such that one could only swim. We are very happy,” said local resident Tamara Maslennikova.

In total, from the beginning of 2019, more than 63 thousand square meters were restored in the district. the roads. For example, the work was performed on the Kirov St., Vatutin St., Soviet Army St., Krasnodontsev St., Lenin Ave., Kirov Ave., October Ave. and others.

There over 300 thousand sqm roadbed were repaired in 2019 in Nizhny Novgorod. Earlier, the heads of district administrators were instructed to monitor the work of contractors hired for budget money. It was stated that defects are not payable.

Ru-Main, 20.11.2019, Picture: Nizhniy Novgorod regional Website 



Related Posts


Leave a Reply

Your email address will not be published. Required fields are marked *